Engineering Sector

Hindustan Dorr bags two new orders worth Rs 66 crore from Vedanta Group

Hindustan Dorr bags two new orders worth Rs 66 crore from Vedanta GroupHindustan Dorr Oliver Ltd, a leading total engineering solution provider company, has bagged two prestigious Orders in Mineral Sector worth Rs 66 crore from Vedanta Group.

The company secured first order worth Rs 48.5 crore from Vedanta Group for their 12.5 LTPA Aluminium Smelter Expansion Project at Jharsuguda.

L&T Receives Rs 12.45 Bn Order From Bhutan; Stock Surges

L&T Receives Rs 12.45 Bn Order From Bhutan; Stock Surges Larsen & Toubro, the country’s largest manufacturer of equipment for the nuclear power sector, has announced that it has received an order from Bhutan.

The project to be executed by L&T’s construction division is for the construction of the Dam Package, which is a part of the 1,200 MW Punatsangchhu-I Hydroelectric Project Authority in Bhutan.

The project is being set up by the Punatsangchhu-I Hydroelectric Project Authority that has been constituted through a contract between the Indian Government and the Royal Government of Bhutan. 

L&T Receives Rs 345 Crore Order From NPCIL; Stock Down 3.4%

L&T Receives Rs 345 Crore Order From NPCIL; Stock Down 3.4%Larsen & Toubro, India’s largest maker of equipment for the nuclear power sector, has announced that it has received an order from the Nuclear Power Corporation of India Ltd (NPCIL).

The scope of the order, which is valued at Rs 345 crore, includes design, manufacture and supply of four steam generators for 700 megawatt electric (MWe) pressurised heavy water reactors.

In an announcement, the company said that the steam generators would be supplied to the Kakrapar Atomic Power project 3 and 4.

Hindustan Dorr Oliver bags order worth Rs 24 crore

Hindustan Dorr Oliver bags order worth Rs 24 croreHindustan Dorr Oliver Ltd., a leading total engineering solution provider, has picked an order worth Rs 24 crore from HPCL-Mittal Energy Ltd.

The scope of work includes detailed engineering, shop & site fabrication, transportations and supply of Process Pressure Vessels weighing from 50 MT to 250 MT each.

The project is schedule to complete within a period of 12-14 months.

Sadbhav Engineering wins order worth Rs 1571 crore

Sadbhav Engineering wins order worth Rs 1571 croreAhmedabad-based Sadbhav Engineering has informed that its joint venture has won an order worth Rs 1571 crore from Maharashtra State Road Development Corporation for modernization and computerization of integrated border check posts at 22 locations in Maharashtra.

The project will be build on Build Operate and Transfer Basis in the name of Joint Venture known as 'Sadbhav - SREI- SREI Sahaj Consortium' in the ratio of 51:39:10 respectively.

The project has concession period of 24 years six months inclusive of construction period of 18 months.

ONGC signs pact for enhancing production from matured fields

ONGC signs pact for enhancing production from matured fieldsNew Delhi, Feb. 16 : The Oil and natural Gas Corporation (ONGC) has entered into a strategic alliance with M/s Weatherford, a leading international oilfield service provider to jointly work in various areas.

Pages